Product definition, as shown in the NBS Product Manual below, is in process of transitioning to Nucor Buildings Group (NBG) Certified Erection Details. Slight changes may have occurred on pages marked “LEGACY PRODUCT INFORMATION”. Current information can be found within the NBG Certified Erection Details on the lower portion of this page. Please contact your local division for verification of the detail’s status. Throughout the sections, you will notice blue hyperlinks that will take you to another part of the manual or open a .dwg file.
1.0 – Introduction
2.0 – Standard Product Summary
3.0 – Specification Guide
4.1 – Primary Framing
4.2 – Endwall Framing
4.3 – Secondary Framing
4.4 – Bracing Systems
4.5 – Mezzanine System
4.6 – Crane Systems – See NBG Certified Details
4.7 – Existing Building Tie-In Systems
4.8 – Future Expansion Details
4.9 – Tilt-Up / Pre-Cast Wall
4.10 – Non-Load Bearing Masonry Wall
4.11 – Structural Parapet Details
4.12 – Auxiliary Rafter Details
4.13 – Lean-To Rafter Details
4.14 – Spandrel Beam Details
5.0 – Nucor CFR Standing Seam Roof System
5.5 – Nucor VR16 II Vertical Rib Standing Seam Roof
6.0 – Classic Wall & Roof Sheeting
6.5 – SR2 Insulated Standing Seam Roof Panel
6.6 – HR3 Insulated Roof Panel
6.7 – Insulated Wall Panel
7.1 – Standard Trim
7.2 – Canopies & Eave/Rake Extensions
7.3 – Standard Fascia
7.4 – Partitions & Draft Curtains
7.5 – Standard Liner Panel
7.6 – Non-Structural Parapet
7.7 – Inset/Outset Condition
7.8 – Horizontal Gutter (Steep Slope)
8.0 – Accessories
9.0 – Anchor Bolt Details
10.0 – Frame Details – See NBG Certified Details
11.1 – Purlin/Girt Details
11.2 – Bracing Details
11.3 – Insulated Roof Panel Details
11.4 – Insulated Wall Panel Details
12.0 – Glossary of Terms
Please reference the NBG Certified Erection Details for projects designed using the new common details. For legacy technical information on projects not affected by the new common details, continue to reference the NBS Product Manual above. If you need further assistance, please reach out to your Sales Representative or Project Coordinator.
A0 – General Details
AB – Post & Beam Endwalls
AD – Exp EW Column to RF Rafter
AF – Rod Cable SW Wind Bracing
AG – Flange Bracing
AH – Crane Systems
AJ – Portal Frame
AK – Brace Strut
AN – Eave & Rake Extensions
AP – Mezzanines
B0 – General Details
BA – Low Eave
BB – Interior Details
BC – High Eave
BD – Rake Details
BE – Purlin Bracing
BF – General Joist & Deck Notes
BG – Shortspan (K-Series) Joist
BH – Longspan (LH-Series) Joist
BI – Joist Bridging
BK – Roof Framed Openings
BM – Nested Purlins
C0 – General Details
CA – SW EW Flush Girt Conditions
CB – SW EW Insert Girt Conditions
CC – SW EW Bypass Girt Conditions
CD – Flush Corner Girt Conditions
CE – Inset Corner Girt Conditions
CF – Bypass Corner Girt Conditions
CG – Framed Opening Conditions
CJ – Inside Corner Girt Connections
CM – Nested Girt Details
CP – Girt Bracing
DA – General Details
DB – Low Eave Basic
DB – Low Eave Basic Corners
DD – Low Eave Gutter
DD – Low Eave Gutter Corners
DE – Rake Sculptured
DF – Rake Parapets
DG – Ridge Details
DG – Ridge Terminations
DH – High Eave Sculptured
DH – High Eave Sculptured Corners
DI – High Eave Parapets
DI – High Eave Parapet Corners
DK – Parapet Gutters
DK7 – Parapet Gutter Terminations
DL – Valley Gutters
DO – Eave Rake Extensions
DM – Translucent Panels
DN – Standard & Lightweight Curbs
DQ – Canopy Sheeting
EA6 – General Details
EB6 – Low Eave Basic
EB7 – Low Eave Basic Corners
ED6 – Low Eave Gutter
ED7 – Low Eave Gutter Corners
EE6 – Rake Sculptured
EF6 – Rake Parapets
EG6 – Ridge Details
EG7 – Ridge Terminations
EH6 – High Eave Sculptured
EH7 – High Eave Sculptured Corners
EI6 – High Eave Parapets
EI7 – High Eave Parapet Corners
EJ6 – Expansion Joints
EJ7 – Expansion Joint Terminations
EK6 – Parapet Gutters
EK7 – Parapet Gutter Terminations
EL6 – Valley Gutters
EM6 – Translucent Panels
EN6 – Roof Curbs
EO6 – Eave Rake Extensions
EP6 – Hips & Valleys
EQ6 – Canopy Sheeting
EA3 – General Details
EB3 – Low Eave Basic
EB7 – Low Eave Basic Corners
ED3 – Low Eave Gutter
ED7 – Low Eave Gutter Corners
EE3 – Rake Sculptured
EF3 – Rake Parapets
EG3 – Ridge Details
EG7 – Ridge Terminations
EH3 – High Eave Sculptured
EH7 – High Eave Sculptured Corners
EI3 – High Eave Parapets
EI7 – High Eave Parapet Corners
EJ3 – Expansion Joints
EJ7 – Expansion Joint Terminations
EK3 – Parapet Gutters
EK7 – Parapet Gutter Terminations
EL3 – Valley Gutters
EN3 – Roof Curbs
EO3 – Eave Rake Extensions
EP3 – Hips & Valleys
EQ3 – Canopy Sheeting
EA8 – General Details
EB8 – Low Eave Basic
ED8 – Low Eave Gutter
EE8 – Rake Sculptured
EF8 – Rake Parapet
EG8 – Ridge
EH8 – High Eave Sculptured
EI8 – High Eave Parapet
EN4 – HR3 Roof Curbs
EN5 – SR2 Roof Curbs
EN8 – Std & Lightweight Curbs
GA4 – General Wall
GB4 – Base Conditions
GC4 – Corners
GD4 – Framed Openings
GA – General Details
GB – Base Conditions
GC – Corners
GD – Framed Openings
GE – Translucent Wall Panels
GF – Inset/Outset
HK – Fascia & Parapet Trim
FA – General
FB – Low Eave Simple Trim
FD – Low Eave Gutters
FE – Rake Sculptured
FF – Rake Parapets
FG – Ridge Details
FH – High Eave Sculptured
FI – High Eave Parapets
FJ – Expansion Joints
FK – Parapet Gutters
FL – Valley Gutters
FN – Roof Curbs
FO – Eave & Rake Extensions
IA – General Details
IAA – Flange Brace w/Liner
IC – Base Details
ID – High & Low Eaves
IE – Wall & Ceiling Liner Rakes
IF – Ceiling Liner Ridge
IG – Framed Openings